VDN Engineering Ltd
VDN Engineering Ltd
  • Home
  • About Us
  • Technology
    • IRZ TEK
    • LATERAL COMPLETIONS
  • More
    • Home
    • About Us
    • Technology
      • IRZ TEK
      • LATERAL COMPLETIONS
  • Home
  • About Us
  • Technology
    • IRZ TEK
    • LATERAL COMPLETIONS

About Us

Our early days

We were stablished in Q1 2011, to provide Consultancy Services for the Upstream Sector of the Oil & Gas industry.  Focusing in Completions, Well Interventions, Workover and Artificial Lift. 

Well Engineering expertise along the typical Well Delivery Process.

Our Experience

With more than 30 years of experience,  we have expanded our portfolio to different areas and disciplines of the Upstream Sector. Mainly focusing in Technology R&D, Product Development, Systems Integration, Commercialization and Field Implementation of Drilling, Interventions Systems, Fluids,  Cementing for a variety of field challenges.

Where are we today

Additional to the on-going Well Engineering activities, We're currently associated with different Oil Service Equipment manufacturers, supporting the introduction of their product lines to the British and European Oil & Gas Markets. 

Equipment and System such as: Electrical Submersible Pumps,  Gas Lift Systems, Submersible Reciprocating Pumps, PCP, Downhole Monitoring Systems, Anti-Scaling Systems, Surface Multi-Phase Meters and much more.


Please check the "Technology" Section

Director

Angel Reyes

Experienced Oil & Gas professional for more than 30 years, successfully performing in a variety of roles in the Upstream sector of the Oil and Gas industry, around the world.

LIST of Projects

WELL ENGINEERING & BUSINESS DEVELOPMENT PROJECTS - 2017 -2021:

  • Completions and Artificial Lift Advisor for Halliburton Project Management Group in London for the Grevling Project in Norway.
  • Completions & Well Interventions for OML-29 Re-development project - Nigeria.
  • Completions & Artificial Lift Technical Advisor - Kuito Deep Project - Angola.
  • Artificial Lift Consultant for Arne South Field - Denmark.
  • Artificial Lift Consultant for Lion Field - Congo.
  • Business Development Advisor for Plasma based Drilling Systems.
  • Technical advisor for the Conceptual Scope of Work for Project Management Service for Deep Water Riserless Drilling System - Houston. 
  • Well Interventions and Completions Sr. Advisor - B19 Development - Angola

 

R&D PROJECT MANAGEMENT AND ACHIEVEMENTS - 2011-2015:

  • 4 ½” – 5 ½” HPHT Pipe Cutter 410 Deg F and 25,000Psi. Denmark 2013-2015.  Budget: US$ 3MM.
  • 36” Torpedo Base Surface conductors. Brazil 2011-2014. Joint Technology Project between Oil Operators and The Federal University of Rio de Janeiro. Budget: USD$ 5.5MM
  • Riserless Drilling System for a 14”-16” Borehole Section. Brazil – USA - UK 2011-2015.  Total Budget US$ 22MM.
  • Casing Drilling System of a 22” – 26” Bore. Brazil-USA 2011-2014. Budget US$ 7.5MM.
  • Flexible and Self-Healing Cement Blends for Pre-Salt formations. Brazil. 2013-2015. Budget US$ 750K.
  • Non-Circular (Rifle) Wells Phase 1-3 JIP. Norway 2011-2014.  See Publications above: OMAE2014-23959, Annual Transactions Nordic rheology Society, Vol. 22, 2014 and OMAE-23960. Total Budget: US$ 3MM.
  • Well Strengthening JIP Phases 1-2. Norway 2011-2014. Total Budget: US$ 1.5MM. 
  • Modelling and Analysis of BHA and Drill-string Vibrations (Vesda Project Phase 1). Aberdeen 2011-2013. Research Project with the University of Aberdeen. Budget US$ 400K.
  • Coated Intelligent Flow Control Valves. USA 2011-2012. Budget US$ 150K 
  • Condensate Solubility in Oil Based Mud. Brazil 2013-2015. Budget US$ 320K. 
  • Magnetic Hammer Drilling System. Brazil 2014 – 2016. Budget US$5.5M. 
  • Wellhead Fatigue JIP. UK 2010-2014. Total Budget: US$ 150K.
  • Dual Gradient Drilling JIP. Norway 2011-2014. Total Budget: US$ 120K,
  • Ultra-saturated Water Based Drilling Muds for the Brazilian Pre-Salt. Brazil 2011-2013. Total Budget: US$ 1.2MM.


OIL SERVICE COMPANY PROJECTS - 1998 - 2010:

  • Development and Qualification Manager of New Ultra HPHT SCSSSV (25,000 Psi @ 207Deg C) for the West Franklin and Elgyn Fields UK – 2010 - 2013. Budget US$: 7.8M.
  • Development and Qualification Manager of New HPHT Fiber Optics Monitoring System: DTS, DVS and FO T/P Sensors UK – 2010 - 2013. Budget US$ 4.6MM.
  • Development and Qualification Leader for Redundant Intelligent Completions Connectors. Budget US$ 1.5MM.
  • Development and Qualification Leader of Slim-Hole Completion Systems for 5 ½” Light Weight Casing and 3 ½” Flush Joint Tubing Applications (USA – Venezuela 2000 – 2001). Total Budget US$ 3.2 MM.
  • Development, Qualification and Systems Integration Manager for the Temperature Array System for Wells Offshore India. 2006-2007. Total Budget US$ 4.5MM.
  • Development, Qualification and integration Leader for the 9 5/8” Dual Flow ESP Production System. Venezuela-USA 2001. Total Budget US$ 850K
  • Development, Qualification and integration Leader for the 9 5/8” Dual Artificial Lift Flow System (ESP+Gas Lift) completion Venezuela 2001. Total Budget US$ 320K.


OPERATIONAL PROJECTS

  • Well Site Supervisor during the successful deployment of 22 Subsea Oil Producers/Water Injectors and 6 Multi-zone Intelligent Completions under budget, ahead of Schedule and no NPT. 5 Oil Producers Tested @ 10,000 Bbpd - 8,000 Psi at Surface. Canada 2004-2006.
  • Successful Project Team Leader and Integration of Reservoir Monitoring System for a Canadian Atlantic offshore Gas project. Canada 2005.
  • Team Leader during the World Record for a PT Gauge Installation and FO @ 32,182ft. in the Gulf of Mexico - USA. 2002. 

 

Contact Us

Drop us a line!

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

VDN Engineering Ltd

Phone: +44-(0)7450-302202 Email: Angel.Reyes@vdnengineeringltd.co.uk

Copyright © 2021 VDN Engineering Ltd - All Rights Reserved

  • Privacy Policy

Powered by GoDaddy